Bus 138 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bus 138? On this page you'll find 190 study documents about Bus 138.

All 190 results

Sort by

NGN RN HESI EXIT EXAM - Version 1 (V1) All 160 Qs & As Included - Guaranteed Pass A+!!! (All Brand New Q&A Pics Included) Popular
  • NGN RN HESI EXIT EXAM - Version 1 (V1) All 160 Qs & As Included - Guaranteed Pass A+!!! (All Brand New Q&A Pics Included)

  • Exam (elaborations) • 123 pages • 2023
  •   The nurse is reviewing medical prescriptions for newly admitted clients. It would be a priority for the nurse to follow up with the physician if a client with (a) a potassium level of 4.5mEq/L has Kayexalate (sodium polystyrene) prescribed (b) a Dilantin (phenytoin) level of 8 mcg/ml is placed on seizure precautions(c) sensitivity to Aspirin (acetylsalicylic acid) is prescribed Tylenol (acetaminophen) (d) sensitivity to Penicillin is prescribed Zithromax (azithromycin) 2. The nurse fr...
    (0)
  • $18.29
  • 1x sold
  • + learn more
VATI RN COMPREHENSIVE PREDICTOR EXAM FORM A| 180 QUESTIONS AND VERIFIED ANSWERS| 2023 UPDATE Popular
  • VATI RN COMPREHENSIVE PREDICTOR EXAM FORM A| 180 QUESTIONS AND VERIFIED ANSWERS| 2023 UPDATE

  • Exam (elaborations) • 51 pages • 2023 Popular
  • VATI RN COMPREHENSIVE PREDICTOR EXAM FORM A| QUESTIONS AND VERIFIED ANSWERS| 2023 UPDATE 1. A nurse is providing grief counseling for the parents of a school-age child whose sibling recently died. Which of the following statements should the nurse make? A. Try to suppress your grief when your child is present B. Avoid discussing the funeral when your child is around C. Bring the child to the funeral service before visitors arrive D. School-age children tend to view death as a temporary ...
    (0)
  • $12.49
  • 1x sold
  • + learn more
NERC Final Assessment Exam Correct answers (Already GRADED A)
  • NERC Final Assessment Exam Correct answers (Already GRADED A)

  • Exam (elaborations) • 98 pages • 2023
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators C. Geothermal generators...
    (1)
  • $11.99
  • 1x sold
  • + learn more
NERC ~ RC (NP3 Transmission) questions with correct answers
  • NERC ~ RC (NP3 Transmission) questions with correct answers

  • Exam (elaborations) • 21 pages • 2023
  • Available in package deal
  • Q32618 When a high voltage transmission line circuit breaker trips open as a result of a fault, a synchronous check relay will monitor certain values on both the line side and the bus side of the open circuit breaker. Before the synchronous check relay re-closes the open circuit breaker, which of the following values has to be within a certain limit before the circuit breaker will close automatically? CORRECT ANSWER •) Frequency •) Voltage Magnitudes •) Phase Angle between the voltages ...
    (0)
  • $14.99
  • + learn more
NERC Test Questions Flashcards with complete solution 2023
  • NERC Test Questions Flashcards with complete solution 2023

  • Exam (elaborations) • 47 pages • 2023
  • NERC Test Questions Flas(REVIEW DIAGRAM #1) If CB-5 is closed, which of the following best describes the impact on the voltages at Stations A and B? A. voltage at Station B will increase and the voltage at Station A will decrease B. voltage at Station A will increase and the voltage at Station B will decrease C. voltage at Station A and B will increase D. voltage at Station A and B will decrease - correct answer voltage at Station A and B will decrease (REVIEW DIAGRAM #2) If a high v...
    (0)
  • $17.49
  • + learn more
NERC Test 1questions With Complete Solutions
  • NERC Test 1questions With Complete Solutions

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation ...
    (0)
  • $12.49
  • + learn more
My NERC questions with correct answers
  • My NERC questions with correct answers

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans...
    (0)
  • $16.49
  • + learn more
TEST BANK FOR BUSINESS DRIVEN TECHNOLOGY 7Th Edition By PAIGE BALTZAN
  • TEST BANK FOR BUSINESS DRIVEN TECHNOLOGY 7Th Edition By PAIGE BALTZAN

  • Exam (elaborations) • 1194 pages • 2023
  • Plug-In B3 Hardware and Software Basics True / False Questions 1. Volatility is a protected memory space created by the CPU allowing the computer to create virtual machines. True False 2. Complex instruction set computer chips limit the number of instructions the CPU can execute to increase processing speed. True False 3. A computer is an electronic device operating under the control of instructions stored in its own memory that can accept, manipulate, and stor...
    (0)
  • $31.59
  • 1x sold
  • + learn more
NERC ~ RC (NP3 Transmission)
  • NERC ~ RC (NP3 Transmission)

  • Exam (elaborations) • 14 pages • 2023
  • Q32618 When a high voltage transmission line circuit breaker trips open as a result of a fault, a synchronous check relay will monitor certain values on both the line side and the bus side of the open circuit breaker. Before the synchronous check relay re-closes the open circuit breaker, which of the following values has to be within a certain limit before the circuit breaker will close automatically? - Answer- •) Frequency •) Voltage Magnitudes •) Phase Angle between the voltages •) ...
    (0)
  • $12.49
  • + learn more
NERC Test 1questions With Complete Solutions
  • NERC Test 1questions With Complete Solutions

  • Exam (elaborations) • 18 pages • 2023
  • NERC Test 1questions With Complete Solutions A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed a...
    (0)
  • $9.49
  • + learn more
NERC ~ RC -NP3 Transmission- 2023 Exam with Complete Solutions
  • NERC ~ RC -NP3 Transmission- 2023 Exam with Complete Solutions

  • Exam (elaborations) • 14 pages • 2023
  • Available in package deal
  • Q32618 When a high voltage transmission line circuit breaker trips open as a result of a fault, a synchronous check relay will monitor certain values on both the line side and the bus side of the open circuit breaker. Before the synchronous check relay re-closes the open circuit breaker, which of the following values has to be within a certain limit before the circuit breaker will close automatically? - ANSWER-•) Frequency •) Voltage Magnitudes •) Phase Angle between the voltages •) A...
    (0)
  • $12.99
  • + learn more