ARE 5.0 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about ARE 5.0? On this page you'll find 99 study documents about ARE 5.0.

Page 3 out of 99 results

Sort by

ARE 5.0 - Construction & Evaluation Test with 100%  Correct | Latest Updated Graded A+
  • ARE 5.0 - Construction & Evaluation Test with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 34 pages • 2024
  • ARE 5.0 - Construction & Evaluation Test with 100% Correct | Latest Updated Graded A+ Competitive bid - Can be public or private and involves more than 1 contractor Negotiated Bid - For privately funded projects, Owner and Architect work with 1 GC to reach a price Why would an Owner hire a Construction Manager as Adviser (CMa)? - To assist in project delivery by providing cost estimating, scheduling, and construction contract management services to the Owner Which project delivery li...
    (0)
  • $6.99
  • + learn more
ARE 5.0 Programming & Analysis Exam with 100%  Correct | Latest Updated Graded A+
  • ARE 5.0 Programming & Analysis Exam with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 34 pages • 2024
  • ARE 5.0 Programming & Analysis Exam with 100% Correct | Latest Updated Graded A+ Satellite Towns - Smaller towns dependent on larger towns nearby for business. New Town Concept - Started in Great Britain in the 1940's, it is an extension of the idea that entirely new communities can be built away from the crowding and ugliness of existing cities. New Urbanism - A more recent planning philosophy that attempts to counter the many undesirable aspects of city development, including suburba...
    (0)
  • $7.99
  • + learn more
ARE 5.0 PPD Test with 100% Correct | Latest  Updated Graded A+
  • ARE 5.0 PPD Test with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 38 pages • 2024
  • ARE 5.0 PPD Test with 100% Correct | Latest Updated Graded A+ Annalemma - The figure 8 curve that represents the angular offset of the sun from its mean position at as viewed from the earth Balance Point Temperature - The outdoor temperature at which a building makes the transition from a heating to a cooling need Daylight autonomy - The percentage of an area that meets a minimum daylight illuminance level or specified fraction of the operating hours per year. also referred to as spec...
    (0)
  • $7.09
  • + learn more
ARE 5.0 PPD Test with 100% Correct | Latest  Updated Graded A+
  • ARE 5.0 PPD Test with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 38 pages • 2024
  • ARE 5.0 PPD Test with 100% Correct | Latest Updated Graded A+ Annalemma - The figure 8 curve that represents the angular offset of the sun from its mean position at as viewed from the earth Balance Point Temperature - The outdoor temperature at which a building makes the transition from a heating to a cooling need Daylight autonomy - The percentage of an area that meets a minimum daylight illuminance level or specified fraction of the operating hours per year. also referred to as spec...
    (0)
  • $9.99
  • + learn more
ARE 5.0 PPD Test with 100% Correct | Latest  Updated Graded A+
  • ARE 5.0 PPD Test with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 38 pages • 2024
  • ARE 5.0 PPD Test with 100% Correct | Latest Updated Graded A+ Annalemma - The figure 8 curve that represents the angular offset of the sun from its mean position at as viewed from the earth Balance Point Temperature - The outdoor temperature at which a building makes the transition from a heating to a cooling need Daylight autonomy - The percentage of an area that meets a minimum daylight illuminance level or specified fraction of the operating hours per year. also referred to as spec...
    (0)
  • $7.99
  • + learn more
ARE 5.0 PA Questions with 100% Correct | Latest  Updated Graded A+
  • ARE 5.0 PA Questions with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 24 pages • 2024
  • ARE 5.0 PA Questions with 100% Correct | Latest Updated Graded A+ Nadir (noun) - The direction pointing below a particular location Light Trespass - When unwanted light enters a neighboring property, for instance, by shining over a fence Light Pollution - The result of outdoor lighting that is not properly shielded, allowing light to be directed into the night sky Dark Sky - Reduce the light going up into the sky that reduces the visibility of the stars Longitude - The number of degre...
    (0)
  • $5.49
  • + learn more
ARE 5.0 PCM Exam with 100% Correct | Latest  Updated Graded A+
  • ARE 5.0 PCM Exam with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 29 pages • 2024
  • ARE 5.0 PCM Exam with 100% Correct | Latest Updated Graded A+ Party Dispute - Problems that arise on a project (i.e. delays, failures, fee controversies) Administrative Proceeding - Problems that arise from civil statutes (i.e. licensing, code compliance, regulations) Standard of Care - What a reasonably prudent architect would do, in the same time and place, given the same or similar facts and circumstances. The law does not require perfection. Duty - A set of terms or requirements th...
    (0)
  • $9.09
  • + learn more
ARE 5.0 PCM Questions and Answers | Latest  Updated Graded A+
  • ARE 5.0 PCM Questions and Answers | Latest Updated Graded A+

  • Exam (elaborations) • 17 pages • 2024
  • ARE 5.0 PCM Questions and Answers | Latest Updated Graded A+ CANNON 1 - GENERAL OBLIGATIONS: MAINTAIN & ADVANCE THEIR KNOWLEDGE OF THE ART & SCIENCE OF ARCHITECTURE, CONTRIBUTE TO ITS GROWTH, EXERCISE LEARNED AND COMPROMISED PROFESSIONAL JUDGEMENT. CANNON II - OBLIGATIONS TO THE PUBLIC: SERVE THE PUBLIC INTEREST IN THEIR PROFESSIONAL AND PERSONAL ACTIVITIES CANNON III - OBLIGATIONS TO THE CLIENT: SERVE CLIENTS COMPETENTLY AND IN A PROFESSIONAL MANNER. CANNON IV - OBLIGATIONS TO THE...
    (0)
  • $8.49
  • + learn more
ARE 5.0 Project Management Questions and Answers  | Latest Updated Graded A+
  • ARE 5.0 Project Management Questions and Answers | Latest Updated Graded A+

  • Exam (elaborations) • 24 pages • 2024
  • ARE 5.0 Project Management Questions and Answers | Latest Updated Graded A+ Project Management - Includes project planning, scheduling, monitoring, coordinating and directing, updating documentation, closing out the job, and following up with clients. Partnering - Various stakeholders in a project (such as the architect, owner, contractor and vendors) all participate in the decision-making process. Bar Chart - Method commonly used for scheduling design and construction projects. Tasks ...
    (0)
  • $9.49
  • + learn more
ARE 5.0: Project Management Questions and  Answers | Latest Updated Graded A+
  • ARE 5.0: Project Management Questions and Answers | Latest Updated Graded A+

  • Exam (elaborations) • 55 pages • 2024
  • ARE 5.0: Project Management Questions and Answers | Latest Updated Graded A+ Application for Payment (A201; Article 9) - Submitted by the Contractor to the Architect. Itemized and prepared in accordance with Schedule of Values. Architect reviews and submits to the owner so that they can pay the contractor, or withholds for valid reasons. Partnering - Stakeholders in a project all participate in decision-making process. Can produce closer communication and shared responsibilities but re...
    (0)
  • $7.99
  • + learn more