University Of The Cumberlands
Latest uploads at University Of The Cumberlands. Looking for notes at University Of The Cumberlands? We have lots of notes, study guides and study notes available for your school.
-
72
- 0
-
2
All courses for University Of The Cumberlands
Latest notes & summaries University Of The Cumberlands
Lab Assessment Questions 
1. Is using the option to Store passwords using reversible encryption a good 
security practice? Why or why not? 
The Store password using reversible encryption policy setting provides support for applications 
that use protocols that require the user's password for authentication. Storing encrypted 
passwords in a way that is reversible means that the encrypted passwords can be decrypted. A 
knowledgeable attacker who is able to break this encryption can then log on t...
Lab 6: Creating a Scheduled Backup and Replicating System Folders 
SECTION 1: Hands-On Demonstration 
Part 2. Configuring DFS 
Course Name and Number: ISOL 534 – Application Security
Lab Assessment Questions 
1. What is installed when you choose the RSAT-DFS-MGMT-Con feature? 
Distributed File System Tools portion of the Remote Server Administration Tools feature 
is installed when we choose the RSAT-DFS-MGMT-Con feature. 
2. How often should servers be backed up? 
The only way to protect a business against valuable data loss is by regular backups. 
Important files should be backed up at minimum once a week, preferably once every 24 
hours. This can be performed manually or ...
The maximum length of the Sprint Review (its time-box) is: 
 
4 hours for a monthly Sprint. For shorter Sprints it is usually shorter. 
 
Who is responsible for managing the progress of work during a Sprint? 
 
The Development Team 
 
 
Who is on the Scrum Team? 
 
 1) The Scrum Master 
 2) The Product Owner 
 3) The Development Team 
 
Which two things does the 
 
1) Deliver an increment of potentially releasable 
Development Team do during 
software 
the first Sprint? 
2) Develop and ...
Question 1 
1 out of 1 points 
The NP recognizes common symptoms for allergic rhinitis include: 
Selected 
Answer: Runny nose and itchy eyes 
Answers: Bloody nasal discharge 
Runny nose and itchy eyes 
Purulent nasal 
discharge 
Cough and fever 
 Question 2 
0 out of 1 points 
Nasal mucosa is typically ________ in allergic rhinitis and _______ in idiopathic rhinitis. 
Selected 
Answer: erythematous; pale 
Answers: 
pale; erythematous 
blue; 
erythematous 
red; 
erythematous 
erythematous; pal...
Question 1 
1 out of 1 points 
In treating patients for depression, the first line pharmacological treatment 
would be: 
Selected 
Answer: Selective serotonin reuptake inhibitors (SSRIs) 
Answers: Monoamine oxidase inhibitors (MAOIs) 
Benzodiazepines 
Selective serotonin reuptake inhibitors (SSRIs) 
Tricyclic antidepressants (TCAs) 
 Question 2 
1 out of 1 points 
Mary is a new mother who was tested HBsAG+ during her prenatal screening 
process. Upon the birth of her infant, the newborn s...
Question 1 
1 out of 1 points 
Martin is a 41 y/o male who comes to the clinic with the following symptoms: fever, chills, 
and malaise. On physical exam, the NP notes that he has a new murmur that was not 
present at his last visit and is aware that he has a prosthetic valve. He also has splinter 
hemorrhages on his nails, and petechiae on his palate. Additional diagnostic criteria for 
Martin’s presumed diagnosis would include which of the following: 
Selected 
Answer: All of the above 
Answ...
Alopecia of outer one third of eyebrow and myxedema is are symptoms of: 
Selected 
Answer: Hypothyroidism 
Answers: Hyperthyroidis 
m 
Thyroid CA 
Hypothyroidism 
Thyrotoxicosis 
 Question 2 
1 out of 1 points 
Insulin doses typically remain the same when a woman with Type 1 Diabetes Mellitus 
becomes pregnant. True or False? 
Selected 
Answer: Falls 
e 
Answers: True 
Fals 
e
1 INTRODUCTION 
1.1 PURPOSE OF THE RISK MANAGEMENT PLAN 
The risk management plan is a primary tool for implementing the organization’s overall risk 
management program. A risk is an event or condition that, if it occurs, could have a positive or 
negative effect on a project’s objectives. Risk Management is the process of identifying, assessing, 
responding to, monitoring, and reporting risks. This Risk Management Plan defines how risks 
associated with the project will be identified, analy...
These risk assessments are used for the identifying and prioritizing based on the importance of the risks in 
Health Network Inc. It also helps in implementing the safeguards for the identified risks in this Health care 
project. And these safeguards are nothing but the controls. These controls will be implemented to control 
the risk or reduce the risk. Health care project is having huge amount of data related to the customer 
information, medical records, employee records, doctor information e...