Accumulated inadvertent Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Accumulated inadvertent? On this page you'll find 77 study documents about Accumulated inadvertent.
All 77 results
Sort by
-
NERC Reliability Coordinator Exam Vocabulary 2023/2024 with Complete Solutions
- Exam (elaborations) • 66 pages • 2023
- Available in package deal
-
- $12.99
- + learn more
NERC Reliability Coordinator Exam Vocabulary 2023/2024 with Complete SolutionsNERC Reliability Coordinator Exam Vocabulary 2023/2024 with Complete SolutionsNERC Reliability Coordinator Exam Vocabulary 2023/2024 with Complete Solutions 
 
Accelerating Power - ANSWER-In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. 
 
Accumulated Inadvertent ...
-
NERC Reliability Coordinator Exam Vocabulary 2023 Questions with complete solution
- Exam (elaborations) • 67 pages • 2023
- Available in package deal
-
- $19.49
- + learn more
NERC Reliability Coordinator Exam Vocabulary 2023 Questions with complete solution 
 
Accelerating Power - correct answer In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. 
 
Accumulated Inadvertent - correct answer The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of a BALANCING AUTHORITY represent...
-
NERC Reliability Coordinator Exam Vocabulary (A+ GRADED)
- Exam (elaborations) • 85 pages • 2023
- Available in package deal
-
- $17.99
- + learn more
Accelerating Power correct answers In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. 
 
Accumulated Inadvertent correct answers The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of a BALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY has either supplied to the INTERCONNECTION ...
-
EPRI Terms & Definitions (A-E) Question and answers already passed 2023/2024
- Exam (elaborations) • 23 pages • 2023
- Available in package deal
-
- $13.99
- + learn more
EPRI Terms & Definitions (A-E) Question and answers already passed 2023/2024 
ACCELERATING POWER - correct answer In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical outputPOWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATORmust have accelerating POWER. 
 
ACCUMULATED INADVERTENT - correct answer The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of aBALANCING AUTHORITY represents the amount of ex...
-
NERC book quiz with correct answers graded A+
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- $12.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due 
to a large loss of load in the contingent BA. If your generator governor control systems 
responded to the frequency deviation approximately how much of a generation change would 
you BA experience? - Answer -4MW 
Net actual interchange minus Net scheduled interchange is what? - Answer Inadvertent 
interchange 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon 
...
As you read this, a fellow student has made another $4.70
-
EPRI Terms & Definitions (A-E)| 193 QUESTIONS| WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 19 pages • 2022
- Available in package deal
-
- $10.49
- + learn more
ACCELERATING POWER correct answer: In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical outputPOWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATORmust have accelerating POWER. 
 
ACCUMULATED INADVERTENT correct answer: The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of aBALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY haseither supplied to the INTERCONNECTION or...
-
NERC book quiz with correct answers graded A+
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
NERC book quiz with correct answers graded A+ 
 
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - Answer -4MW 
 
Net actual interchange minus Net scheduled interchange is what? - Answer Inadvertent interchange 
 
Suppose your interconnection operators at ...
-
NERC EXAM QUESTIONS WITH VERIFIED ANSWERS
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS - Answer b) An inaccurate load forecast 
 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? 
 
a) A net under-generation in Balancin...
-
NERC Certification Practice Questions and Answers (Already GRADED A)
- Exam (elaborations) • 13 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS 
b) An inaccurate load forecast 
 
 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? 
 
a) A net under-generation in Balancing Area...
-
NERC Reliability Coordinator Exam Vocabulary 2023/24 | updated
- Exam (elaborations) • 49 pages • 2023
- Available in package deal
-
- $9.49
- + learn more
NERC Reliability Coordinator Exam Vocabulary 2023/24 | updated 
 
Accelerating Power - In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. 
Accumulated Inadvertent - The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of a BALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY has e...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia