PROJ430 Advanced Project Management

Devry University

Hier vind je de beste samenvattingen om te slagen voor PROJ430 Advanced Project Management. Er zijn o.a. samenvattingen, aantekeningen en oefenvragen beschikbaar.

Alle 2 resultaten

Sorteer op

Final Exam |Elaborated| PROJ430  - Advanced Project Management
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management

  • Tentamen (uitwerkingen) • 39 pagina's • 2021
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
    (0)
  • $12.49
  • + meer info
Final Exam |Elaborated| PROJ430  - Advanced Project Management
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management

  • Tentamen (uitwerkingen) • 39 pagina's • 2021
  • Final Exam |Elaborated| PROJ430 - Advanced Project Management PERT and CPM are quantitative analysis tools designed to schedule and control large projects. ANSWER: TRUE 13.2 PERT is a deterministic analysis tool allowing for precise times of activities within a project. ANSWER: FALSE 13.3 PERT had its beginnings in a military department of the United States. ANSWER: TRUE 13.4 CPM is a probabilistic analysis of managing a project. ANSWER: FALSE 13.5 An event is a point in time that marks th...
    (0)
  • $12.49
  • + meer info