Acnt 2402 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Acnt 2402? On this page you'll find 35 study documents about Acnt 2402.

All 35 results

Sort by

ACNT 2402 Chapter 09 -- Performance Measurement in Decentralized Organizations – Study Guide
  • ACNT 2402 Chapter 09 -- Performance Measurement in Decentralized Organizations – Study Guide

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • 1. Land held for possible plant expansion would not be included as an operating asset when computing return on investment (ROI). TRUE 2. When used in return on investment (ROI) calculations, operating assets do not include investments in land held for future use and investments in other companies. TRUE 3. A disadvantage of using ROI to evaluate performance is that it encourages the manager to reduce the investment in operating assets as well as increase net operating income. FALSE 4. Op...
    (0)
  • $9.49
  • + learn more
 ACNT 2402 Chapter 06 -- Variable Costing and Segment Reporting: Tools for Management – Study Guide
  • ACNT 2402 Chapter 06 -- Variable Costing and Segment Reporting: Tools for Management – Study Guide

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • 1. Under variable costing, variable production costs are not treated as product costs. FALSE 2. Under variable costing, fixed manufacturing overhead cost is not treated as a product cost. TRUE 3. Under variable costing, product costs consist of direct materials, direct labor, and variable manufacturing overhead. TRUE 4. The costs assigned to units in inventory are typically lower under variable costing than under absorption costing. TRUE 5. Under variable costing, product cost does no...
    (0)
  • $9.49
  • + learn more
 ACNT 2402 Chapter 09 -- Performance Measurement in Decentralized Organizations – Study Guide
  • ACNT 2402 Chapter 09 -- Performance Measurement in Decentralized Organizations – Study Guide

  • Exam (elaborations) • 10 pages • 2023
  • Chapter 09 -- Performance Measurement in Decentralized Organizations – Study Guide 1. Land held for possible plant expansion would not be included as an operating asset when computing return on investment (ROI). TRUE 2. When used in return on investment (ROI) calculations, operating assets do not include investments in land held for future use and investments in other companies. TRUE 3. A disadvantage of using ROI to evaluate performance is that it encourages the manager to reduce the...
    (0)
  • $9.49
  • + learn more
ACNT 2402Chapter 08 - Study Guide Questions and Answers(2022/2023)
  • ACNT 2402Chapter 08 - Study Guide Questions and Answers(2022/2023)

  • Other • 28 pages • 2023
  • Chapter 8 – Flexible Budgets, Standard Costs, and Variance Analysis Study Guide 1. Comparing a static planning budget to actual costs is a good way to assess whether variable costs are under control. FALSE 2. Directly comparing a static planning budget to actual costs helps to distinguish between differences in costs that are due to changes in activity and differences that are due to how well costs were controlled. FALSE 3. Fixed costs should be ignored when evaluating how well a mana...
    (0)
  • $9.49
  • + learn more
 ACNT 2402Chapter 02 - Study GuideQuestions and Answers(2022/2023)
  • ACNT 2402Chapter 02 - Study GuideQuestions and Answers(2022/2023)

  • Other • 26 pages • 2023
  • Chapter 02 Job-Order Costing 1. The use of a predetermined overhead rate in a job-order cost system makes it possible to compute the total cost of a job before production is begun. FALSE 2. If direct labor-hours is used as the allocation base in a job-order costing system, but overhead costs are not caused by direct-labor hours, then jobs with high direct labor requirements will tend to be undercosted relative to jobs with low direct labor requirements. FALSE 3. The formula for computi...
    (0)
  • $9.99
  • + learn more
 ACNT 2402 Chapter 02 Job-Order Costing- Study Guide  VERIFIED 100%
  • ACNT 2402 Chapter 02 Job-Order Costing- Study Guide VERIFIED 100%

  • Case • 26 pages • 2023
  • Available in package deal
  • 1. The use of a predetermined overhead rate in a job-order cost system makes it possible to compute the total cost of a job before production is begun. FALSE 2. If direct labor-hours is used as the allocation base in a job-order costing system, but overhead costs are not caused by direct-labor hours, then jobs with high direct labor requirements will tend to be undercosted relative to jobs with low direct labor requirements. FALSE 3. The formula for computing the predetermined overhead r...
    (0)
  • $10.49
  • + learn more
 ACNT 2402Chapter 03 - Study Guide
  • ACNT 2402Chapter 03 - Study Guide

  • Other • 14 pages • 2023
  • Chapter 03 -- Activity-Based Costing - Study Guide 1. Batch-level activities are performed each time a batch of goods is processed. The cost of a batch-level activity is proportional to the number of units in the batch. FALSE 2. Activity-based costing involves a two-stage allocation process in which overhead costs are first assigned to departments and then allocated to products using activity measures. FALSE 3. In the second-stage allocation in activity-based costing, overhead costs are a...
    (0)
  • $9.99
  • + learn more
 ACNT 2402Chapter 03 - Study Guide
  • ACNT 2402Chapter 03 - Study Guide

  • Other • 14 pages • 2023
  • Chapter 03 -- Activity-Based Costing - Study Guide 1. Batch-level activities are performed each time a batch of goods is processed. The cost of a batch-level activity is proportional to the number of units in the batch. FALSE 2. Activity-based costing involves a two-stage allocation process in which overhead costs are first assigned to departments and then allocated to products using activity measures. FALSE 3. In the second-stage allocation in activity-based costing, overhead costs are a...
    (0)
  • $9.49
  • + learn more
 ACNT 2402 Chapter 02 -Questions and Answers 2023& study guide with complete solution
  • ACNT 2402 Chapter 02 -Questions and Answers 2023& study guide with complete solution

  • Exam (elaborations) • 26 pages • 2023
  • 1. The use of a predetermined overhead rate in a job-order cost system makes it possible to compute the total cost of a job before production is begun. FALSE 2. If direct labor-hours is used as the allocation base in a job-order costing system, but overhead costs are not caused by direct-labor hours, then jobs with high direct labor requirements will tend to be undercosted relative to jobs with low direct labor requirements. FALSE 3. The formula for computing the predetermined overhead r...
    (0)
  • $9.49
  • + learn more